Precast with pre-topped double tees; elevator; two 10-ft clear ground levels. Included utility relocations and 700-lf of concrete roadway ($1M); 7000-gsf shell space.
11.7 Million
$6,882*
5405
$9152.00**
*$6294 without road/utilities
**$8370 without road/utilities
Financing costs not included since bond-interest income during construction offsets costs.