Parking Structure #7, Under Construction
6/07 – 5/09
This facility serves two distinct user groups with independent, dual drive ramps and multiple elevators. This project was delivered using the Design/Build Bridging method. Precast with field topped double trees, three 10-ft clear ground levels and 12,000-gsf shell space.
2,000
25 Million
$12,500 |
 |